Located in Nunavut, the Meadowbank open-pit gold mine is the first mine operated by Agnico Eagle in Canada’s Low Arctic.
Under this project, SM Construction prefabricated and installed fuel transfer stations for the mine, including electrical installations, instrumentation and control. Our team also completed the project by installing 20 tanks and several pumping units at Meadowbank Airport and at the gold mine. This project required serious engineering and rigorous planning.
Finally, Pagui, another subsidiary of Groupe SM Tardif, performed all of the electrical works related to this fuel farm.