Electricity,

CHU de Québec, Québec

For the main electrical inlet of Hôpital de l’Enfant-Jésus, Pagui supplied and installed a new 25 kV substation, in addition to transformers and outdoor sectionalizing cabinets on concrete pedestals. The entire transfer of the existing power supplies and the critical loads (operating room, intensive care, etc.) on the new network was assumed by our specialized team.

Location: Québec, Québec

Client: CHU de Québec / Hôpital de l'Enfant-Jésus

Type of project: Electricity

Scope: $1 M - $5 M

The project in picture