Construction, Modular, Electricity, Plumbing, Telecommunications,

Realization and construction of a modular extension of a primary school

The Modular Department team proceeded with the construction of the modular extension of the Grand-Voilier school. This project was carried out in collaboration with Pagui (electricity, plumbing and telecommunications) and Tardif Métal, other subsidiaries of the SM Tardif Group.

Location: Saint-Nicolas

Client: Commission Scolaire des Découvreurs

Type of project: Modular

Scope: $ 2 000 000 - $ 2 500 000

The project in pictures

The prefabrication and construction of the 12 modules includes:

– Classes

– Corridors

– 4 staircase modules

– 2 corridors connecting the extension to the existing building

Everything was installed on temporary foundations built during the construction site.