Plumbing,

Replacement of the water tower

The Pagui Plumbing team took charge of the demolition of the existing water tower and the installation of two adiabatic coolers. They also replaced the pump connected to the cooling network.

Location: Montmagny

Client: Commission scolaire de la Côte-Sud

Type of project: Plumbing

Scope: $ 100 000 - $ 500 000

The project in pictures

Refroidisseurs installés sur le toit de l’école

Pompe reliée au réseau de refroidissement