SM Construction's mandate was to modernize an bulk plant, a replacement of the tanks took place.

Location: St-Georges de Beauce

Client: Groupe Filgo-Sonic

Type of project: Bulk Plants

Scope: $ 1 000 000 - $ 5 000 000

The project in pictures

Our experts therefore proceeded

  • – to increase the storage capacity of the depot;
  • – to overhaul the piping to put it above ground and thus reduce environmental risks;
  • – replaced the pumps to increase transfer capacities.

Remblayage

Our team also set up an electronic system for measuring, monitoring levels and product transfer transactions taking place on the site.

We replaced two underground steel tanks with 110,000-liter fiberglass tanks.

During the realization of this project, we were able to keep the site in operation during the excavation phase and the installation of the tanks.